Friday, April 13, 2012

Stick in the Mud...

Shortly after we hauled out our boat, we decided that the mast needed to come down so that we could finally get to replacing our chainplates and standing rigging.  As you've read from previous posts, we are a case study for crevice corrosion.  After removing and inspecting all of our chainplates, we have discovered that we have cracks in all of them.  YES....all of them.  We decided to ship them all in one shot up to Dutchess Metal in NY to have them re-fabricated out of 316 stainless steel so as to avoid any future dismasting. We have read one too many articles and books about failure in rigging and chainplates being the root cause of a fallen stick and this is a fear that intimidates the hell out of the both of us, so the decision to replace these was not a hard one.  It is also recommended that all standing rigging should be replaced every 10-15 years, and as far as we know, ours is original to the boat so another thing to add to our ever growing shopping list.


Using a piece of wood as leverage for removing the chainplates



Prepping the mast for unstepping was a relatively straight-forward ordeal that involved meticulously labeling and taping off where the turnbuckles were tuned prior to loosening them.  This way, when the new rigger makes the new stay, they can see where it was tuned to and can make the proper adjustments.  After taping them off, prepping the mast involved labeling the wires that go the electronics on the mast and making sure that it was all disconnected from the base.  The intricate part of this involved snaking our radar wire through the boat and into the base of the compression post.  We were initially a little concerned about having to cut and re-splice this wire to a busbar, but luckily after a day of acrobatics throughout the boat, I was able to successfully get the wire out without having to cut it.  A real achievement as far as I'm concerned!

Marking where they are turned to prior to loosening 

We then loosened all the turnbuckles to make sure that they weren't seized up when the crane came. With a little help from PB Blast, a lubricant similar to WD-40 but far stronger, any seized turnbuckles were loosened with slight force.  I then removed the cotter pins that held the clevis pins that connected to the chainplates so that it was a matter of just popping them out with a ball peen hammer.  When the crane arrived the next morning, it was matter of being pulled up the mast and securing a strap above the center of gravity so when the mast hangs from the crane, the majority of the weight stays to the bottom, allowing the mast to stay fairly upright.  Luckily for us, we had a friend on another boat at the marina stepping his mast an hour before ours so we were able to help each other out thus avoiding having to pay a premium fee to the boatyard workers for the same help.  With the help of 3 friends at the yard, we were able to get the mast off safely without any injuries, though when it finally popped loose from the step, it jumped about 2 ft into the air with a loud bang, keeping us on our toes and nearly ruining my underwear.

Unnerving moment


Our mast is now on stands, stripped of all her hardware and halyards, and is sitting patiently as we prepare her for a makeover.  We are looking to repaint it as there are some areas where the paint has flaked off.  We are also sending out the rigging and replacing the tangs as soon as the engine is back in the boat so we'll keep you posted as to how all of that goes.

Friday, April 6, 2012

♫ Nanni-Nanni, Nanni-Nanni, hey, hey, hey, Goodbye ♫.......


We finally bit the bullet and hauled Moitessier out of the water.  We have been dreading this moment for some time now, holding off and creating new projects for ourselves just to avoid this inevitability.  To be honest, we were both incredibly apprehensive about it for our fears of not getting her back in the water.   Fear of being inundated with all the projects that being hauled out involved, fear of once again biting off more than we could chew, and simply fear of the unknown (Yes, our last boat traumatized us a little....).  Not only that, but living on the hard also means no refrigeration (water cooled), AC (also water cooled), and no head thus having to climb up and down a 12 ft ladder just to go to the bathroom.  Not fun at all, but we figured we had better just stop moaning and being cowards about it, because that's not going to get us anywhere.


The first major project on our long list is repowering.  Yes, I just said those dreaded words....repowering!  Every boat owner's worst nightmare (well, at least mine.)  This is a very expensive and labor intensive project that we had no intention on undertaking until about 2 months ago after making a deal at the Miami Boat Show with Yanmar.  Up until the show, we hadn't fully decided on what to do with our old Mercedes Nanni Engine.  Though the Mercedes side had passed the compression tests with flying colors, we were having serious trouble finding parts for the marinized Nanni portion of the engine.  After months of unsuccessfully trying to go through Nanni to get parts for our heat exchanger, we found that in order to get the marinized side of the engine up to shape, we would have to custom make a lot of the parts, as Nanni discontinued most of the pieces we had needed and no one else made parts for the Mercedes block.   Long story short, this would've meant thousands of dollars poured into a 30 year old engine, something that just didn't make sense to us.  Anyhow, with the huge discount that we were able to finagle at the show, we opted for a 75 hp Yanmar.  Everyone has their own beast of choice, but we chose Yanmar mainly for the parts availability/popularity.  It's comforting to know no matter which anchorage we pull into in the world, we will not have problems finding spares (for at least another 10 years ;)

Our new 75 hp 4JH4-TE in its crate

Hauling the boat out was....an experience.  We had already started disconnecting the engine, preparing for it to be pulled as soon we were on the hard, therefore, getting to slings required a tow.  This was complicated by the fact that we had to pull in stern first so that our stays could clear the travel lift.  It was a white knuckled ordeal, but thanks to the amazing yard help, it went smoother than it could have.  Since we had already removed the heat exchanger, hoses, wiring, and alternator before haul out yanking the engine from the boat merely involved removing the shaft coupler, unscrewing it from the mounts, and lifting it out through the butterfly hatches.   This went out pretty easily with the help of the yard's boom truck.

Hatches removed


Out she goes 

Up up and away!

Then it was on to the big cleanup.  Since access to anything underneath the engine or in the bilges would be nonexistent once the new Yanmar goes in, we decided to address everything and anything that was in there.  Frank started with a thorough cleaning of the bilges, followed by organizing the wires, removing any obsolete wire, and creating well secured runs.  In the process, we discovered that our fresh water hoses were shot (cracked, delaminated, and chafed!).  And so Pandora's box is opened.  We decided that it was time to re-plumb and opted for PEX hoses with copper crimped connections.  This job was pretty straight forward, in the end, only 2 of the roughly 80 fittings had leaks, and those were the threaded connections (not the crimped ones).  Pretty good for Frank, as he is notoriously bad at plumbing.   A few turns on the leaky fittings remedied them and the new hoses are a big improvement over their predecessors.  All in all, a 2 day project that cost around $200...not too bad.




PEX water lines


After painting the bilges with grey Bilgekote, we are now removing and replacing 3 thru-hulls and seacocks in the engine room.  One of these will be turned into a keel cooler (for our future Frigoboat refrigeration unit), another will be replaced with a new Groco seacock for the engine intake, and the third will be glassed over (as we are selling our 6KW Kohler gen-set).  In the process of all of this, we discovered that one of our water tanks (the 25 gallon one sitting under our engine) was merely held in place by the fill hose.  A little shocking as when it's full, it weighs about 200 lbs.  How it never broke free before is a mystery/miracle to us.  Frank is addressing this issue by welding stainless steel "L" brackets, fiberglassing them to the tanks, and bolting them to the wooden stringers in the bilge.

It's been about a week and half and it seems like we've been on the hard for a month.  Crazy how living up a 12 ft ladder, in humid 80 degree Florida weather, with a dorm room fridge can be so motivating!  We hope to have the new engine dropped in place by next week, but who knows as we are at the mercy of Fedex and UPS for the shipment of all of the new parts we need.